Installation with tiles
Step One - Corners
Remove all four spreader fins on the self-levelling head, and place this Nurajack in a corner.
Step Two – Along the walls
Remove two opposing fins from each of the self-levelling heads of the Nurajacks to be installed along the walls.
Apply clear spacers to the perimeter tiles. The spacers should be tightly butted between the tile and the cladding of the building to create a drainage gap.
Step Three – Central Nurajacks
All four fins are required on the Nurajacks in the central part of the installation. Lay the tiles so that they sit into the corners provided on the self-levelling heads of the Nurajacks. Repeat this tile laying process.
By this method a flat and continuous raised floor, even in presence of considerable differences in level or slopes, will be created. The small gap between one slab and another allows water to drain away quickly.
Once the installation of all tiles is completed, the Nurajacks may be adjusted from above, thanks to the exclusive regulation key.