Situated in one of the most beautiful parts of New Zealand.
Nuraunderlay tanking membrane was used to waterproof the buried elements of the new Vineyard. The wall was 5 metres high and 75 metres around the building, therefore the job was done in 2 lifts. The finished job was protected with 40mm polystyrene which was propped and glued to the membrane and “Cordrain” drainage mat was laid against that. The job took approximately 3 weeks to complete. With views like that – worth every minute!
Applicator: Watertight Systems Ltd, Wanaka
Architect: Rafe Maclean Architects