top of page
Warranty Registration
Applicator:
Loading...
Checklist
General
Comply*
Substrate readiness form completed.
Project signoff form completed
The project has been installed in accordance to specification
All non standard details installed are pre-approved specifications
Any damage to membrane sheet repaired.
Roof / Deck Areas
Comply
Cap sheet and basesheet fully bonded together, no areas of delamination.
Roof drains & overflows installed to specification and watertight.
Gutters correctly and neatly installed, particularly the internal corners.
Gutters and outlets have been floodtested.
Cap sheet and base sheet laps offset satisfactorily. No three layer lap build-ups.
Overall installation free of wrinkles, creases and splits.
Nuravents installed to specification.
Tanking Areas
Comply
Mortar/concrete fillets fitted to all internal junctions and corners chamfered at a 45° radius.
All corners and upstands incorporate reinforcing or underflashing.
Under-slab membrane extends beyond footing and carefully protected until vertical membrane installed.
Bleed visible on all joints.
Junction of the floor and wall membranes installed to specification fully bonded and watertight.
Membrane termination completed to approved detail.
Specified drainage system installed below footing as per specification.
Membrane protection boards installed correctly.
Car Parking Membrane Areas
Comply
Underflashings installed to all corners and upstands (pay attention to parapets, gutters, junctions) All upstands overlaid with Nuraply.
Membrane is watertight and ready for the installation of the trafficable topping.
Important:
A warranty is a legally binding document that will place obligations on Nuralite Group Ltd. By completing this form, requesting a warranty and distributing the warranty to your customer you undertake that:
-
The products used have been sourced solely from Nuralite to provide a complete waterproofing solution.
-
All installation procedures have been performed in accordance with the printed technical information provided by Nuralite Group Ltd.
-
You will pay in full for all the products purchased.

Registered Warranties
Max 20 most recent warranties shown. Click on row to download warranty.
Building Name
Address
Owner
Architect
Building Consent
Installed
System
Downloads
Belvedere
-
Fletcher Residential Ltd
BCO10390745-1
15 May 2026
-
-​
-
Owners of 23 Poplar Road, Stanmore Bay
BCO 10387070
26 May 2025
-
-​
-
DG GROUP LTD
20 Feb 2026
-
-​
10 Closeburn Station
-
Rapaki Trustee Ltd
31 Jan 2025
-
-​
-
Mark Desmond Trigg & MD Trigg Trustee Ltd
EBC-2024-618/0
30 Jul 2024
-
-​
Woolworths
-
Sovereign Property Company Ltd
ABA 20250668
4 Nov 2025
-
-​
-
Owner of 8 Weona Place
BCO10388682
22 Apr 2026
-
-​
720 Highgate
-
MJW Homes Highgate Ltd
ABA-2025-1190
21 Nov 2026
-
-​
-
Phillip Stevenson
28 May 2026
-
-​
Kauaeranga Visitor Centre
-
Department of Conservation
22 Apr 2026
-
-​
-
CHUNYI WANG
3 Sept 2025
-
-​
RESIDENTIAL
-
CHUNYI WANG
3 Sept 2025
-
-​
-
Eleven at Mauao
350355
10 Oct 2025
-
-​
1/61 Line Road, Glenn Innes
-
Tamaki Regeneration Ltd
BCO10382945
30 Jan 2026
-
-​
2/61 Line Road, Glenn Innes
-
Tamaki Regeneration Ltd
BCO10382945
30 Jan 2026
-
-​
4/61 Line Road, Glenn Innes
-
Tamaki Regeneration Ltd
BCO10382945
30 Jan 2026
-
-​
5/61 Line Road, Glenn Innes
-
Tamaki Regeneration Ltd
BCO10382945
30 Jan 2026
-
-​
6/61 Line Road, Glenn Innes
-
Tamaki Regeneration Ltd
BCO10382945
30 Jan 2026
-
-​
7/61 Line Road, Glenn Innes
-
Tamaki Regeneration Ltd
BCO10382945
30 Jan 2026
-
-​
8/61 Line Road, Glenn Innes
-
Tamaki Regeneration Ltd
BCO10382945
30 Jan 2026
-
-​
bottom of page