top of page

Warranty Registration

Applicator:

Loading...

Checklist

General

Comply*

Substrate readiness form completed.

Project signoff form completed

The project has been installed in accordance to specification

All non standard details installed are pre-approved specifications

Any damage to membrane sheet repaired.

Roof / Deck Areas

Comply

Cap sheet and basesheet fully bonded together, no areas of delamination.

Roof drains & overflows installed to specification and watertight.

Gutters correctly and neatly installed, particularly the internal corners.

Gutters and outlets have been floodtested.

Cap sheet and base sheet laps offset satisfactorily. No three layer lap build-ups.

Overall installation free of wrinkles, creases and splits.

Nuravents installed to specification.

Tanking Areas

Comply

Mortar/concrete fillets fitted to all internal junctions and corners chamfered at a 45° radius.

All corners and upstands incorporate reinforcing or underflashing.

Under-slab membrane extends beyond footing and carefully protected until vertical membrane installed.

Bleed visible on all joints.

Junction of the floor and wall membranes installed to specification fully bonded and watertight.

Membrane termination completed to approved detail.

Specified drainage system installed below footing as per specification.

Membrane protection boards installed correctly.

Car Parking Membrane Areas

Comply

Underflashings installed to all corners and upstands (pay attention to parapets, gutters, junctions) All upstands overlaid with Nuraply.

Membrane is watertight and ready for the installation of the trafficable topping.

Upload
Max: 3 Documents

Important:

A warranty is a legally binding document that will place obligations on Nuralite Group Ltd. By completing this form, requesting a warranty and distributing the warranty to your customer you undertake that:

  • The products used have been sourced solely from Nuralite to provide a complete waterproofing solution.

  • All installation procedures have been performed in accordance with the printed technical information provided by Nuralite Group Ltd.

  • You will pay in full for all the products purchased.

preloading image

Registered Warranties

Max 20 most recent warranties shown. Click on row to download warranty.

Building Name

Address

Owner

Architect

Building Consent

Installed

System

Downloads

-

.

26 Aug 2024

-

-​

Greenmeadows School

-

Secretary For Education

BCO10376828

10 Apr 2026

-

-​

-

Bryce Howard & Jayme Fuller

10 Jul 2025

-

-​

-

Rhys and Carla Metcalfe

BCO10382686

10 Apr 2026

-

-​

-

Pimlico Body Corporate

10 Apr 2026

-

-​

116A Victoria Avenue

-

Grant Burns

26 Mar 2026

-

-​

-

Bernard Carty

Ken Hughes

BCO1039444

15 Dec 2025

-

-​

-

Julien Jean-Francois Warnan & Jane Jing Leung

BCO10386729

20 Aug 2025

-

-​

LOT 102 DP51815

-

Faisal Samut

BC 010347077

14 Mar 2026

-

-​

-

Monique Anne Ottaway & Georgina Kathryn Yates

BCO10391544

20 Aug 2025

-

-​

Allen House

-

Allen Shanks

SR No: 548847

5 Dec 2025

-

-​

-

Stephen White

341170

16 Oct 2025

-

-​

-

Sharon Lark

26 Mar 2026

-

-​

wanganui girls college

-

ministry of education

4 Feb 2026

-

-​

Lot 4 92E Manukau Rd.

-

Epsom Residences Ltd.

15 Nov 2024

-

-​

Lot 3 92D Manukau Rd.

-

Epsom Residences Ltd.

15 Nov 2024

-

-​

-

Kevin Mengxi Shen, Shanshan Wang

BCO10397396

1 Apr 2026

-

-​

-

John Padrigo

30 Mar 2026

-

-​

RESIDENTIAL

-

DVM CONSTRUCTION

6 Jul 2025

-

-​

RESIDENTIAL

-

DVM CONSTRUCTION

15 Jan 2026

-

-​

bottom of page