top of page
Warranty Registration
Applicator:
Loading...
Checklist
General
Comply*
Substrate readiness form completed.
Project signoff form completed
The project has been installed in accordance to specification
All non standard details installed are pre-approved specifications
Any damage to membrane sheet repaired.
Roof / Deck Areas
Comply
Cap sheet and basesheet fully bonded together, no areas of delamination.
Roof drains & overflows installed to specification and watertight.
Gutters correctly and neatly installed, particularly the internal corners.
Gutters and outlets have been floodtested.
Cap sheet and base sheet laps offset satisfactorily. No three layer lap build-ups.
Overall installation free of wrinkles, creases and splits.
Nuravents installed to specification.
Tanking Areas
Comply
Mortar/concrete fillets fitted to all internal junctions and corners chamfered at a 45° radius.
All corners and upstands incorporate reinforcing or underflashing.
Under-slab membrane extends beyond footing and carefully protected until vertical membrane installed.
Bleed visible on all joints.
Junction of the floor and wall membranes installed to specification fully bonded and watertight.
Membrane termination completed to approved detail.
Specified drainage system installed below footing as per specification.
Membrane protection boards installed correctly.
Car Parking Membrane Areas
Comply
Underflashings installed to all corners and upstands (pay attention to parapets, gutters, junctions) All upstands overlaid with Nuraply.
Membrane is watertight and ready for the installation of the trafficable topping.
Important:
A warranty is a legally binding document that will place obligations on Nuralite Group Ltd. By completing this form, requesting a warranty and distributing the warranty to your customer you undertake that:
-
The products used have been sourced solely from Nuralite to provide a complete waterproofing solution.
-
All installation procedures have been performed in accordance with the printed technical information provided by Nuralite Group Ltd.
-
You will pay in full for all the products purchased.

Registered Warranties
Max 20 most recent warranties shown. Click on row to download warranty.
Building Name
Address
Owner
Architect
Building Consent
Installed
System
Downloads
-
ROSS HOMES LTD
8 Jun 2026
-
-​
5 Omana Esplanade, Maraetai
-
Lynda Chapman
BCO10401936
11 Sept 2026
-
-​
-
Mainfreight Limited
BCO10410572
24 Aug 2026
-
-​
Manawa Commercial
-
Manawa Development Holdings LP
240339
30 Sept 2025
-
-​
-
MICRO DEVELOPING LTD
7 Jan 2026
-
-​
-
IAN DAVID RAINEY; SHARON LEE NEWEY, LYNETTE SANDRA HO
20 Mar 2026
-
-​
-
BIN XUE
8 May 2024
-
-​
-
Jeremy Chang and Joanna Salmond Chang
24 Mar 2026
-
-​
-
Jeremy Chang and Joanna Salmond Chang
ABA2025-369
24 Mar 2026
-
-​
Preston Residence
-
Stefan & Leslie Preston
BC240703
16 Jul 2025
-
-​
-
Urban Plus limited
Miles Construction
BC240663
4 Feb 2026
-
-​
Preston Residence Footings
-
Stefan & Leslie Preston
BC240703
25 Feb 2025
-
-​
Mitre 10
-
Mitre 10 Holding Ltd
6 Aug 2026
-
-​
Gym
-
Owens Family Trust
31 Aug 2026
-
-​
Gym
-
Owens Family Trust
31 Aug 2026
-
-​
-
Peter Lassen
20 Aug 2026
-
-​
Shed 6, Port of Auckland
-
Philippe Macgregor, Maintenance Manager
24 Aug 2026
-
-​
-
David John Warwick Nicoll, Kerry Rex Titchener, Sharron Maree McColl, Adrianne Vilma Titchener
BCO10383807-B
24 Feb 2026
-
-​
Commercial
-
Libbet Limited
10407684
27 Apr 2026
-
-​
-
Michael Watson Barton, Eleanor Margaret Millard
BCO1040645
24 Feb 2026
-
-​
bottom of page

