top of page

Warranty Registration

Applicator:

Loading...

Checklist

General

Comply*

Substrate readiness form completed.

Project signoff form completed

The project has been installed in accordance to specification

All non standard details installed are pre-approved specifications

Any damage to membrane sheet repaired.

Roof / Deck Areas

Comply

Cap sheet and basesheet fully bonded together, no areas of delamination.

Roof drains & overflows installed to specification and watertight.

Gutters correctly and neatly installed, particularly the internal corners.

Gutters and outlets have been floodtested.

Cap sheet and base sheet laps offset satisfactorily. No three layer lap build-ups.

Overall installation free of wrinkles, creases and splits.

Nuravents installed to specification.

Tanking Areas

Comply

Mortar/concrete fillets fitted to all internal junctions and corners chamfered at a 45° radius.

All corners and upstands incorporate reinforcing or underflashing.

Under-slab membrane extends beyond footing and carefully protected until vertical membrane installed.

Bleed visible on all joints.

Junction of the floor and wall membranes installed to specification fully bonded and watertight.

Membrane termination completed to approved detail.

Specified drainage system installed below footing as per specification.

Membrane protection boards installed correctly.

Car Parking Membrane Areas

Comply

Underflashings installed to all corners and upstands (pay attention to parapets, gutters, junctions) All upstands overlaid with Nuraply.

Membrane is watertight and ready for the installation of the trafficable topping.

Upload
Max: 3 Documents

Important:

A warranty is a legally binding document that will place obligations on Nuralite Group Ltd. By completing this form, requesting a warranty and distributing the warranty to your customer you undertake that:

  • The products used have been sourced solely from Nuralite to provide a complete waterproofing solution.

  • All installation procedures have been performed in accordance with the printed technical information provided by Nuralite Group Ltd.

  • You will pay in full for all the products purchased.

preloading image

Registered Warranties

Max 20 most recent warranties shown. Click on row to download warranty.

Building Name

Address

Owner

Architect

Building Consent

Installed

System

Downloads

Crown Warehouse, Warehouse 1

-

Crown

Ashton Mitchell

30 Mar 2026

-

-​

Ngati Otara Marae

-

Auckland Council

20 May 2026

-

-​

RESIDENTIAL

-

X & L HOMES LTD

1 Dec 2025

-

-​

-

Kate Davenport and Tim Christmas

BCO10392073

19 Sept 2025

-

-​

Commercial property

-

Auckland Transport

10405764

12 Apr 2026

-

-​

-

Lindy Frank

350220

27 Feb 2026

-

-​

RESIDENTIAL

-

OCEAN PROPERTIES LTD

15 Mar 2026

-

-​

-

MetLifecare Villages Ltd

1 Apr 2026

-

-​

-

MetLifecare retirement villages ltd

1 Aug 2025

-

-​

Block D, Lot 15

-

Jal Red Beach Ltd

BCO10393036

5 Aug 2025

-

-​

Block D, Lot 14

-

Jal Red Beach Ltd

BCO10393035

5 Aug 2025

-

-​

Block D, Lot 13

-

Jal Red Beach Ltd

BCO10393034

5 Aug 2025

-

-​

Block D, Lot 12

-

Jal Red Beach Ltd

BCO10392963

5 Aug 2025

-

-​

6 Logan Terrace

-

Nic Brooke and Rowan Howden

BCO10396203

8 Oct 2025

-

-​

Lynfield College

-

Lynfield College Block D

BCO 10399436

13 May 2026

-

-​

Residencial Townhouses

-

Josip Mavrovich

28 May 2026

-

-​

Currie Residence

-

23 Apr 2026

-

-​

-

Daryl Shing

15 May 2026

-

-​

-

Samuel Anthony Stringfield, Isobel Lucy Stringfield

BCO10368069-A

24 Feb 2026

-

-​

-

MS Shapland and YRW Trustees 2011 Limited

ABA/2021/1244

12 Mar 2026

-

-​

bottom of page