top of page
Warranty Registration
Applicator:
Loading...
Checklist
General
Comply*
Substrate readiness form completed.
Project signoff form completed
The project has been installed in accordance to specification
All non standard details installed are pre-approved specifications
Any damage to membrane sheet repaired.
Roof / Deck Areas
Comply
Cap sheet and basesheet fully bonded together, no areas of delamination.
Roof drains & overflows installed to specification and watertight.
Gutters correctly and neatly installed, particularly the internal corners.
Gutters and outlets have been floodtested.
Cap sheet and base sheet laps offset satisfactorily. No three layer lap build-ups.
Overall installation free of wrinkles, creases and splits.
Nuravents installed to specification.
Tanking Areas
Comply
Mortar/concrete fillets fitted to all internal junctions and corners chamfered at a 45° radius.
All corners and upstands incorporate reinforcing or underflashing.
Under-slab membrane extends beyond footing and carefully protected until vertical membrane installed.
Bleed visible on all joints.
Junction of the floor and wall membranes installed to specification fully bonded and watertight.
Membrane termination completed to approved detail.
Specified drainage system installed below footing as per specification.
Membrane protection boards installed correctly.
Car Parking Membrane Areas
Comply
Underflashings installed to all corners and upstands (pay attention to parapets, gutters, junctions) All upstands overlaid with Nuraply.
Membrane is watertight and ready for the installation of the trafficable topping.
Important:
A warranty is a legally binding document that will place obligations on Nuralite Group Ltd. By completing this form, requesting a warranty and distributing the warranty to your customer you undertake that:
-
The products used have been sourced solely from Nuralite to provide a complete waterproofing solution.
-
All installation procedures have been performed in accordance with the printed technical information provided by Nuralite Group Ltd.
-
You will pay in full for all the products purchased.

Registered Warranties
Max 20 most recent warranties shown. Click on row to download warranty.
Building Name
Address
Owner
Architect
Building Consent
Installed
System
Downloads
Banbury Stage 7C
-
BMC
BCN/2025/2760
9 Oct 2025
-
-
Banbury Stage 7B
-
BMC
BCN/2023/4112
6 Aug 2025
-
-
House
-
Latham
30 May 2025
-
-
House
-
Latham
29 Aug 2025
-
-
-
Darryl Chard
12 Jan 2026
-
-
-
Mike & Irena Kotlicka
BCO10259182
31 Aug 2020
-
-
Residential
-
DJER CONSTRUCTION LTD
3 Jun 2025
-
-
-
Lewis Grant
24 Feb 2026
-
-
-
Robert James Andrew Taylor & Doretta Palmolungo
BCO10317770
6 May 2022
-
-
-
Neha Patel, Ramesh Ramchhodbhai Patel
BCO10400311
30 Apr 2025
-
-
-
Neha Patel, Ramesh Ramchhodbhai Patel
BCO10400311
30 Apr 2025
-
-
-
Neha Patel, Ramesh Ramchhodbhai Patel
BCO10400311
30 Apr 2025
-
-
-
John and Tui Marson
350543
25 Jul 2025
-
-
-
Neha Patel, Ramesh Ranchhodbhai Patel
BCO10400311
30 Apr 2025
-
-
-
Martin and Heather Schilt
331738
28 Oct 2025
-
-
Lot 273 DP 20612
-
Peter Jones
BCO10390451-2
17 Jul 2025
-
-
23 Marjon Drive, Wanaka
-
Shane & Belinda Edmond
BC241186
11 Aug 2025
-
-
Residential
-
Z&M Building Ltd
30 Nov 2025
-
-
-
Karen Joy Naran, Umesh Chandra Parbhu, Umesh Chandra Naran
BCO10343213
19 Jul 2023
-
-
Katie's Test
-
Walthar
Test
Test
5 Feb 2026
-
-
bottom of page

