Warranty Registration
Applicator:
Loading...
Checklist
General
Comply*
Substrate readiness form completed.
Project signoff form completed
The project has been installed in accordance to specification
All non standard details installed are pre-approved specifications
Any damage to membrane sheet repaired.
Roof / Deck Areas
Comply
Cap sheet and basesheet fully bonded together, no areas of delamination.
Roof drains & overflows installed to specification and watertight.
Gutters correctly and neatly installed, particularly the internal corners.
Gutters and outlets have been floodtested.
Cap sheet and base sheet laps offset satisfactorily. No three layer lap build-ups.
Overall installation free of wrinkles, creases and splits.
Nuravents installed to specification.
Tanking Areas
Comply
Mortar/concrete fillets fitted to all internal junctions and corners chamfered at a 45° radius.
All corners and upstands incorporate reinforcing or underflashing.
Under-slab membrane extends beyond footing and carefully protected until vertical membrane installed.
Bleed visible on all joints.
Junction of the floor and wall membranes installed to specification fully bonded and watertight.
Membrane termination completed to approved detail.
Specified drainage system installed below footing as per specification.
Membrane protection boards installed correctly.
Car Parking Membrane Areas
Comply
Underflashings installed to all corners and upstands (pay attention to parapets, gutters, junctions) All upstands overlaid with Nuraply.
Membrane is watertight and ready for the installation of the trafficable topping.
Important:
A warranty is a legally binding document that will place obligations on Nuralite Group Ltd. By completing this form, requesting a warranty and distributing the warranty to your customer you undertake that:
-
The products used have been sourced solely from Nuralite to provide a complete waterproofing solution.
-
All installation procedures have been performed in accordance with the printed technical information provided by Nuralite Group Ltd.
-
You will pay in full for all the products purchased.

Registered Warranties
Max 20 most recent warranties shown. Click on row to download warranty.
Building Name
Address
Owner
Architect
Building Consent
Installed
System
Downloads
-
Huia Maree Midgley, Desiree Morgan
BCO10390621
3 Nov 2025
-
-​
-
School Road Properties Limited
EBC-2024-1013/0/A
31 Mar 2026
-
-​
-
School Road Properties Limited
EBC-2024-1013/0/A
31 Mar 2026
-
-​
Howick Library
-
2650099106 - Auckland Council
BCO10376438
16 Nov 2026
-
-​
Units 5 & 6 The Tiers Roof
-
The Tiers Woods Limited
BC251416
27 May 2026
-
-​
Units 5 & 6 The Tiers Tanking
-
The Tiers Woods Limited
BC251416
24 Apr 2026
-
-​
-
Anita Kumar Chang & Nile Chang
31 Oct 2026
-
-​
177 Parker Rd.
-
Graham Gilliberg
13 Nov 2025
-
-​
-
PACIFICWIDE INVESTMENT LTD
15 Jun 2026
-
-​
-
JUPITER & MERCURY LTD
30 Mar 2026
-
-​
RESIDENTIAL
-
JIANFANG ZHANG
21 Jul 2026
-
-​
Dune House
-
-
-​
Private
-
Ken Huffadine
30 Oct 2026
-
-​
Dune House
-
Summit Structures Ltd
BCO10376307
13 Sept 2024
-
-​
-
Shirley Hooper
341159
19 Jun 2026
-
-​
S34539 - The Hill
-
Fletcher Residential Limited
BCO10390745-3
30 Oct 2026
-
-​
-
Shane Coote
BCO10403814-A
29 Oct 2026
-
-​
-
Henry Christodoulos Leventis and Hannah Sonia Leventis
EBC-2025-933/0/A
29 Sept 2026
-
-​
Onetangi Beach Apartments
-
Body Corporate #321250
Lapp & Toft Architecture Ltd
BCO10392324
28 Nov 2025
-
-​
Onetangi Beach Apartments
-
Body Corporate #321250
Lapp & Toft Architecture Ltd
BCO10367156
4 Nov 2025
-
-​