top of page
Warranty Registration
Applicator:
Loading...
Checklist
General
Comply*
Substrate readiness form completed.
Project signoff form completed
The project has been installed in accordance to specification
All non standard details installed are pre-approved specifications
Any damage to membrane sheet repaired.
Roof / Deck Areas
Comply
Cap sheet and basesheet fully bonded together, no areas of delamination.
Roof drains & overflows installed to specification and watertight.
Gutters correctly and neatly installed, particularly the internal corners.
Gutters and outlets have been floodtested.
Cap sheet and base sheet laps offset satisfactorily. No three layer lap build-ups.
Overall installation free of wrinkles, creases and splits.
Nuravents installed to specification.
Tanking Areas
Comply
Mortar/concrete fillets fitted to all internal junctions and corners chamfered at a 45° radius.
All corners and upstands incorporate reinforcing or underflashing.
Under-slab membrane extends beyond footing and carefully protected until vertical membrane installed.
Bleed visible on all joints.
Junction of the floor and wall membranes installed to specification fully bonded and watertight.
Membrane termination completed to approved detail.
Specified drainage system installed below footing as per specification.
Membrane protection boards installed correctly.
Car Parking Membrane Areas
Comply
Underflashings installed to all corners and upstands (pay attention to parapets, gutters, junctions) All upstands overlaid with Nuraply.
Membrane is watertight and ready for the installation of the trafficable topping.
Important:
A warranty is a legally binding document that will place obligations on Nuralite Group Ltd. By completing this form, requesting a warranty and distributing the warranty to your customer you undertake that:
-
The products used have been sourced solely from Nuralite to provide a complete waterproofing solution.
-
All installation procedures have been performed in accordance with the printed technical information provided by Nuralite Group Ltd.
-
You will pay in full for all the products purchased.

Registered Warranties
Max 20 most recent warranties shown. Click on row to download warranty.
Building Name
Address
Owner
Architect
Building Consent
Installed
System
Downloads
-
Karen Joy Naran, Umesh Chandra Parbhu, Umesh Chandra Naran
BCO10343213
19 Jul 2023
-
-
Test
-
Test
Test
Test
5 Feb 2026
-
-
Kaiapoi Substation
-
Martin Civil Construction
24 Nov 2025
-
-
-
Chris Bell
24 Oct 2025
-
-
-
Reymer Residence
330615
25 Jul 2024
-
-
Private property
-
Lloyd Stevenson Boat Builders
10399178
14 Nov 2025
-
-
-
Reymer Residence
330615
20 May 2025
-
-
-
Inglis Brownless Residence
240113
4 Dec 2025
-
-
-
Cypress Properties Ltd
BP106515
14 Nov 2025
-
-
Proposed Refurbishment
-
Depends Severn Street Limited
BCO10387327
16 Dec 2025
-
-
Residential
-
Hao C hen
14 Jul 2025
-
-
-
Piet Verburg
23 Jan 2026
-
-
-
Test
11 Feb 2026
-
-
Private Property
-
Corson & Donna Finnemore
10387750
18 Dec 2024
-
-
Residential
-
Owen Hugh Mackinnon
28 Jul 2025
-
-
Residential
-
Fitzgerald homes ltd
15 Oct 2025
-
-
PROPOSED REFURBISHMENT
-
Depends Severn Street Limited
BCO10387327
16 Dec 2025
-
-
House 7 1 Hobart street
-
BGB Trustees Limited & Nelson No 2 Trustee Limited
BC231194
23 Jun 2025
-
-
-
Alex Coburn
BCO10371806
29 Jan 2026
-
-
Cremorne House
-
Cremorne House
BCO10366120-1
7 May 2025
-
-
bottom of page

