Warranty Registration

Applicator:

Loading...

Checklist

General

Comply*

Substrate readiness form completed.

Project signoff form completed

The project has been installed in accordance to specification

All non standard details installed are pre-approved specifications

Any damage to membrane sheet repaired.

Roof / Deck Areas

Comply

Cap sheet and basesheet fully bonded together, no areas of delamination.

Roof drains & overflows installed to specification and watertight.

Gutters correctly and neatly installed, particularly the internal corners.

Gutters and outlets have been floodtested.

Cap sheet and base sheet laps offset satisfactorily. No three layer lap build-ups.

Overall installation free of wrinkles, creases and splits.

Nuravents installed to specification.

Tanking Areas

Comply

Mortar/concrete fillets fitted to all internal junctions and corners chamfered at a 45° radius.

All corners and upstands incorporate reinforcing or underflashing.

Under-slab membrane extends beyond footing and carefully protected until vertical membrane installed.

Bleed visible on all joints.

Junction of the floor and wall membranes installed to specification fully bonded and watertight.

Membrane termination completed to approved detail.

Specified drainage system installed below footing as per specification.

Membrane protection boards installed correctly.

Car Parking Membrane Areas

Comply

Underflashings installed to all corners and upstands (pay attention to parapets, gutters, junctions) All upstands overlaid with Nuraply.

Membrane is watertight and ready for the installation of the trafficable topping.

Upload
Max: 3 Documents

Important:

A warranty is a legally binding document that will place obligations on Nuralite Group Ltd. By completing this form, requesting a warranty and distributing the warranty to your customer you undertake that:

  • The products used have been sourced solely from Nuralite to provide a complete waterproofing solution.

  • All installation procedures have been performed in accordance with the printed technical information provided by Nuralite Group Ltd.

  • You will pay in full for all the products purchased.

preloading image

Registered Warranties

Max 20 most recent warranties shown. Click on row to download warranty.

Building Name

Address

Owner

Architect

Building Consent

Installed

System

Downloads

-

ARCO Projects Ltd

11 Aug 2025

-

-​

Banbury Stage 7C

-

BMC

BCN/2025/2760

9 Oct 2025

-

-​

Banbury Stage 7B

-

BMC

BCN/2023/4112

6 Aug 2025

-

-​

House

-

Latham

30 May 2025

-

-​

House

-

Latham

29 Aug 2025

-

-​

-

Darryl Chard

12 Jan 2026

-

-​

-

Mike & Irena Kotlicka

BCO10259182

31 Aug 2020

-

-​

Residential

-

DJER CONSTRUCTION LTD

3 Jun 2025

-

-​

-

Lewis Grant

24 Feb 2026

-

-​

-

Robert James Andrew Taylor & Doretta Palmolungo

BCO10317770

6 May 2022

-

-​

-

Neha Patel, Ramesh Ramchhodbhai Patel

BCO10400311

30 Apr 2025

-

-​

-

Neha Patel, Ramesh Ramchhodbhai Patel

BCO10400311

30 Apr 2025

-

-​

-

Neha Patel, Ramesh Ramchhodbhai Patel

BCO10400311

30 Apr 2025

-

-​

-

John and Tui Marson

350543

25 Jul 2025

-

-​

-

Neha Patel, Ramesh Ranchhodbhai Patel

BCO10400311

30 Apr 2025

-

-​

-

Martin and Heather Schilt

331738

28 Oct 2025

-

-​

Lot 273 DP 20612

-

Peter Jones

BCO10390451-2

17 Jul 2025

-

-​

23 Marjon Drive, Wanaka

-

Shane & Belinda Edmond

BC241186

11 Aug 2025

-

-​

Residential

-

Z&M Building Ltd

30 Nov 2025

-

-​

-

Karen Joy Naran, Umesh Chandra Parbhu, Umesh Chandra Naran

BCO10343213

19 Jul 2023

-

-​