top of page
Warranty Registration
Applicator:
Loading...
Checklist
General
Comply*
Substrate readiness form completed.
Project signoff form completed
The project has been installed in accordance to specification
All non standard details installed are pre-approved specifications
Any damage to membrane sheet repaired.
Roof / Deck Areas
Comply
Cap sheet and basesheet fully bonded together, no areas of delamination.
Roof drains & overflows installed to specification and watertight.
Gutters correctly and neatly installed, particularly the internal corners.
Gutters and outlets have been floodtested.
Cap sheet and base sheet laps offset satisfactorily. No three layer lap build-ups.
Overall installation free of wrinkles, creases and splits.
Nuravents installed to specification.
Tanking Areas
Comply
Mortar/concrete fillets fitted to all internal junctions and corners chamfered at a 45° radius.
All corners and upstands incorporate reinforcing or underflashing.
Under-slab membrane extends beyond footing and carefully protected until vertical membrane installed.
Bleed visible on all joints.
Junction of the floor and wall membranes installed to specification fully bonded and watertight.
Membrane termination completed to approved detail.
Specified drainage system installed below footing as per specification.
Membrane protection boards installed correctly.
Car Parking Membrane Areas
Comply
Underflashings installed to all corners and upstands (pay attention to parapets, gutters, junctions) All upstands overlaid with Nuraply.
Membrane is watertight and ready for the installation of the trafficable topping.
Important:
A warranty is a legally binding document that will place obligations on Nuralite Group Ltd. By completing this form, requesting a warranty and distributing the warranty to your customer you undertake that:
-
The products used have been sourced solely from Nuralite to provide a complete waterproofing solution.
-
All installation procedures have been performed in accordance with the printed technical information provided by Nuralite Group Ltd.
-
You will pay in full for all the products purchased.

Registered Warranties
Max 20 most recent warranties shown. Click on row to download warranty.
Building Name
Address
Owner
Architect
Building Consent
Installed
System
Downloads
-
.
26 Aug 2024
-
-
Greenmeadows School
-
Secretary For Education
BCO10376828
10 Apr 2026
-
-
-
Bryce Howard & Jayme Fuller
10 Jul 2025
-
-
-
Rhys and Carla Metcalfe
BCO10382686
10 Apr 2026
-
-
-
Pimlico Body Corporate
10 Apr 2026
-
-
116A Victoria Avenue
-
Grant Burns
26 Mar 2026
-
-
-
Bernard Carty
Ken Hughes
BCO1039444
15 Dec 2025
-
-
-
Julien Jean-Francois Warnan & Jane Jing Leung
BCO10386729
20 Aug 2025
-
-
LOT 102 DP51815
-
Faisal Samut
BC 010347077
14 Mar 2026
-
-
-
Monique Anne Ottaway & Georgina Kathryn Yates
BCO10391544
20 Aug 2025
-
-
Allen House
-
Allen Shanks
SR No: 548847
5 Dec 2025
-
-
-
Stephen White
341170
16 Oct 2025
-
-
-
Sharon Lark
26 Mar 2026
-
-
wanganui girls college
-
ministry of education
4 Feb 2026
-
-
Lot 4 92E Manukau Rd.
-
Epsom Residences Ltd.
15 Nov 2024
-
-
Lot 3 92D Manukau Rd.
-
Epsom Residences Ltd.
15 Nov 2024
-
-
-
Kevin Mengxi Shen, Shanshan Wang
BCO10397396
1 Apr 2026
-
-
-
John Padrigo
30 Mar 2026
-
-
RESIDENTIAL
-
DVM CONSTRUCTION
6 Jul 2025
-
-
RESIDENTIAL
-
DVM CONSTRUCTION
15 Jan 2026
-
-
bottom of page

