Warranty Registration

Applicator:

Loading...

Checklist

General

Comply*

Substrate readiness form completed.

Project signoff form completed

The project has been installed in accordance to specification

All non standard details installed are pre-approved specifications

Any damage to membrane sheet repaired.

Roof / Deck Areas

Comply

Cap sheet and basesheet fully bonded together, no areas of delamination.

Roof drains & overflows installed to specification and watertight.

Gutters correctly and neatly installed, particularly the internal corners.

Gutters and outlets have been floodtested.

Cap sheet and base sheet laps offset satisfactorily. No three layer lap build-ups.

Overall installation free of wrinkles, creases and splits.

Nuravents installed to specification.

Tanking Areas

Comply

Mortar/concrete fillets fitted to all internal junctions and corners chamfered at a 45° radius.

All corners and upstands incorporate reinforcing or underflashing.

Under-slab membrane extends beyond footing and carefully protected until vertical membrane installed.

Bleed visible on all joints.

Junction of the floor and wall membranes installed to specification fully bonded and watertight.

Membrane termination completed to approved detail.

Specified drainage system installed below footing as per specification.

Membrane protection boards installed correctly.

Car Parking Membrane Areas

Comply

Underflashings installed to all corners and upstands (pay attention to parapets, gutters, junctions) All upstands overlaid with Nuraply.

Membrane is watertight and ready for the installation of the trafficable topping.

Upload
Max: 3 Documents

Important:

A warranty is a legally binding document that will place obligations on Nuralite Group Ltd. By completing this form, requesting a warranty and distributing the warranty to your customer you undertake that:

  • The products used have been sourced solely from Nuralite to provide a complete waterproofing solution.

  • All installation procedures have been performed in accordance with the printed technical information provided by Nuralite Group Ltd.

  • You will pay in full for all the products purchased.

preloading image

Registered Warranties

Max 20 most recent warranties shown. Click on row to download warranty.

Building Name

Address

Owner

Architect

Building Consent

Installed

System

Downloads

240 Rangatira Rd

-

240 Rangatira Ltd

BCO10400579

5 Jan 2026

-

-​

C & F Legal

-

C & F Developments Ltd

Redbox - Brad

260128

30 Jun 2026

-

-​

-

Bodo One Limited

BCO10402189

27 Mar 2026

-

-​

Copeland House

-

WHAKATIPURANGA TRUSTEE LIMITED

CONDON SCOTT ARCHITECTS

BC241084

4 Nov 2025

-

-​

-

Sharyn Kathleen Robertson

BC251301

25 May 2026

-

-​

-

Amy & Chris Young

BC250216

14 Nov 2025

-

-​

-

Shaun Longmore

BCO10378428

31 Oct 2024

-

-​

House

-

Sarah and Simon McIntyre

BCO10384126

30 Sept 2025

-

-​

House

-

Sarah and Simon McIntyre

30 Sept 2025

-

-​

-

SHOC PROPERTY LTD

17 Jul 2025

-

-​

-

Suresh Chhagan

1 Jul 2026

-

-​

Kauri Cliffs Golf Course - Matauri Bay

-

Kauri Cliffs Golf Course - Matauri Bay

26 Jun 2026

-

-​

-

NLWFT Limited

EBC-2026-251/0

29 Jun 2026

-

-​

-

Jason Derecourt and Kirsty Joynt

100036

18 Jun 2026

-

-​

Quest

-

Wallace Property Company Limited

ABA 20250110

26 Feb 2026

-

-​

-

Andrew David Johnston, Kate Maree Johnston, Ridge House Trustee Limited

BCO 10400932

18 Dec 2025

-

-​

-

L&L BROTHERS REAL ESTATE LTD

9 Apr 2026

-

-​

95 Tucker Beach Road

-

Haydon Family Trust Limited, Scott & Rachael Haydon

BC211645

8 Apr 2026

-

-​

RESIDENTIAL

-

XIAO YING WEI

4 Mar 2026

-

-​

RESIDENTIAL

-

XIAO YING WEI

4 Mar 2026

-

-​