top of page

Warranty Registration

Applicator:

Loading...

Checklist

General

Comply*

Substrate readiness form completed.

Project signoff form completed

The project has been installed in accordance to specification

All non standard details installed are pre-approved specifications

Any damage to membrane sheet repaired.

Roof / Deck Areas

Comply

Cap sheet and basesheet fully bonded together, no areas of delamination.

Roof drains & overflows installed to specification and watertight.

Gutters correctly and neatly installed, particularly the internal corners.

Gutters and outlets have been floodtested.

Cap sheet and base sheet laps offset satisfactorily. No three layer lap build-ups.

Overall installation free of wrinkles, creases and splits.

Nuravents installed to specification.

Tanking Areas

Comply

Mortar/concrete fillets fitted to all internal junctions and corners chamfered at a 45° radius.

All corners and upstands incorporate reinforcing or underflashing.

Under-slab membrane extends beyond footing and carefully protected until vertical membrane installed.

Bleed visible on all joints.

Junction of the floor and wall membranes installed to specification fully bonded and watertight.

Membrane termination completed to approved detail.

Specified drainage system installed below footing as per specification.

Membrane protection boards installed correctly.

Car Parking Membrane Areas

Comply

Underflashings installed to all corners and upstands (pay attention to parapets, gutters, junctions) All upstands overlaid with Nuraply.

Membrane is watertight and ready for the installation of the trafficable topping.

Upload
Max: 3 Documents

Important:

A warranty is a legally binding document that will place obligations on Nuralite Group Ltd. By completing this form, requesting a warranty and distributing the warranty to your customer you undertake that:

  • The products used have been sourced solely from Nuralite to provide a complete waterproofing solution.

  • All installation procedures have been performed in accordance with the printed technical information provided by Nuralite Group Ltd.

  • You will pay in full for all the products purchased.

preloading image

Registered Warranties

Max 20 most recent warranties shown. Click on row to download warranty.

Building Name

Address

Owner

Architect

Building Consent

Installed

System

Downloads

Belvedere

-

Fletcher Residential Ltd

BCO10390745-1

15 May 2026

-

-​

-

Owners of 23 Poplar Road, Stanmore Bay

BCO 10387070

26 May 2025

-

-​

-

DG GROUP LTD

20 Feb 2026

-

-​

10 Closeburn Station

-

Rapaki Trustee Ltd

31 Jan 2025

-

-​

-

Mark Desmond Trigg & MD Trigg Trustee Ltd

EBC-2024-618/0

30 Jul 2024

-

-​

Woolworths

-

Sovereign Property Company Ltd

ABA 20250668

4 Nov 2025

-

-​

-

Owner of 8 Weona Place

BCO10388682

22 Apr 2026

-

-​

720 Highgate

-

MJW Homes Highgate Ltd

ABA-2025-1190

21 Nov 2026

-

-​

-

Phillip Stevenson

28 May 2026

-

-​

Kauaeranga Visitor Centre

-

Department of Conservation

22 Apr 2026

-

-​

-

CHUNYI WANG

3 Sept 2025

-

-​

RESIDENTIAL

-

CHUNYI WANG

3 Sept 2025

-

-​

-

Eleven at Mauao

350355

10 Oct 2025

-

-​

1/61 Line Road, Glenn Innes

-

Tamaki Regeneration Ltd

BCO10382945

30 Jan 2026

-

-​

2/61 Line Road, Glenn Innes

-

Tamaki Regeneration Ltd

BCO10382945

30 Jan 2026

-

-​

4/61 Line Road, Glenn Innes

-

Tamaki Regeneration Ltd

BCO10382945

30 Jan 2026

-

-​

5/61 Line Road, Glenn Innes

-

Tamaki Regeneration Ltd

BCO10382945

30 Jan 2026

-

-​

6/61 Line Road, Glenn Innes

-

Tamaki Regeneration Ltd

BCO10382945

30 Jan 2026

-

-​

7/61 Line Road, Glenn Innes

-

Tamaki Regeneration Ltd

BCO10382945

30 Jan 2026

-

-​

8/61 Line Road, Glenn Innes

-

Tamaki Regeneration Ltd

BCO10382945

30 Jan 2026

-

-​

bottom of page