top of page

​

What's NEW - Part 2

19 November 2026
Length:
30 Minutes

Explore an overview of the new products and system improvements developed to complete the Nuralite Tanking Solutions.

Cost Conscious Tanking Solutions

Featured Speakers

Shane Clarke

General Manager at Nuralite

Email: shane@nuralite.co.nz

LinkedIn Profile

Callum McDougall

Business Development Manager at Nuralite/Tremco

Email: callum@nuralite.co.nz

LinkedIn Profile

Rod Southwood

National Client Manager

Email: rod@nuralite.co.nz

LinkedIn Profile

​

CPD points are given upon completion of the entire webinar and survey.

Webinar Resources

Full Transcript

[Shane Clarke] Kia ora, tēnā tātou katoa. Shane, General Manager here from Nuralite. Here we are with another webinar. You might be able to tell this is our last webinar of the year. We're sort of heading towards that summer season, jump on the bandwagon and enjoy the upcoming summer break with us. This webinar, unlike the others, isn't CPD accredited with NZIA. If you want to get the CPD points, jump onto the website there and you can see the CPD accredited webinars there. This one is purely product focused and I guess it answers the number one question we get quite a lot, which is what's new, what's new, what's new. Welcome to what's new part two. Part one's already up and then part three will be early next year. Welcome to what's new part two. Lucky for you, I'm not the only one here today. You've got some other people to talk to. We've got Rod Southwood, who some of you may remember. He's been around for a few haircuts now. Welcome Rod. [Rod Southwood] Thanks, mate. Good to be here. [Shane Clarke] And we've got Callum, who is new but not new. New to this business, new to this company. [Callum McDougall] Prior to that, you've been in the industry for a while. I have probably about 20 years plus now, mate, doing the same sort of thing, but you know, all over the show. Some people know me, some people don't. [Shane Clarke] They're lucky. Very much. Welcome aboard, Callum. It's good to have you as part of the Nura-ship, mate. And Callum is the Business Development Manager for this particular line of products. He will be the go-to guy. Here at Nuralite, we're acutely aware of the cost-of-living crisis. For participating in this webinar and answering the three questions in the description below, you're going to draw to win a $100 fuel voucher. If you participate in all three surveys, you go in the draw to win a grand prize of a $1000 fuel voucher. Happy to announce our first winner from the first webinar, which is Paul from National Waterproofing. Well done. [Rod Southwood] Well done, Paul. [Shane Clarke] A hundred dollar fuel voucher should get you halfway home. It's the problem these days, isn't it? It'll get him from Nuralite to his house, maybe. [Rod Southwood] As long as it gets you to Nuralite, that's the main thing. [Shane Clarke] And just to reiterate that this is a very product heavy type webinar. It's primarily aimed at tradies and our applicators and whatnot, but for all the designers on board, welcome. So today we're going to talk about three new products. We've broken them up into groups of three. Some of you may be aware that we were acquired by Tremco in November last year, which has given us access to the building and construction candy shop, if you like. We're now direct to manufacturer so we can add more products and systems to our offering. I guess the main reason for people to listen out today is that we've got these new products and systems coming. We're direct from manufacturer. We're going to be more competitive in the market. Therefore, you as a Nuralite applicator or tradie, hopefully going to secure more work. That's basically it in a nutshell. And if you don't want to listen anymore, you've got the gist of it. What we'll do is we'll rip into what's new part two. We'll jump into the first product. Callum, here we go. Your DPM, you want to tell us what that is? [Callum McDougall] Correct. Thanks Shane. Damp proofing membrane. It's in the industry. It's around a long time. It's used on nearly every project. Traditionally, waterproofing companies haven't gone down this route because it's not a waterproofing membrane. However, we have access, like you said, we've got global manufacturers now. Why not make it part of our system? One supplier, one applicator, one warranty system and one suite of details that connects all the systems together. That's the main point there. I think that we can now make this connect to our other peace of mind for the industry. We have method statements drawn up already for taping DPC to membrane types. That will be readily available. [Shane Clarke] Just going to go through, I guess, some of the high level bits and pieces, keynotes of the membrane. Describe it. I think this is a good point. The New Zealand building code standard is a minimum 250 micron. We've gone the one above. We want 300 bit more security. And because of who we are, we can provide this at a similar, more competitive price as well. The terminations is where it's at. It used to be one supplier for the wall membrane, one supplier for the underslab. And there was always this sort of whose responsibility is this connection? We're now taking the responsibility saying, hey, this is a connection from our DPM to our wall membrane. And we've ensured this is compatible with all of our other tanking systems too. I mean, how many times have you seen this on site when someone's laid the DPM and that someone's got the waterproofing and they're doing this whole thing? And of course it's going to happen, isn't it? Because two people doing the same thing that joined together and pointing fingers. Where does this go? [Callum McDougall] Look, primarily this for the launch that we've done this for is underslab. You know, big areas underslab, it's a very cost effective damp proof membrane. [Shane Clarke] However, Rod's got some other great ideas. You can put it under the footings as well. [Rod Southwood] That's always good. And obviously with the Nuralite range of products and systems we have, we recommend a slip layer DPC in numerous of our details, green roofs, concrete on 3PC, buried membrane. There's a lot of instances we recommend a DPC and having it from us now is just fills up that barrel and gives confidence with everything from one supplier. You can also do crawl spaces under houses with it as well. Very popular. [Shane Clarke] Which I must do my own. It has a lot of uses and it'll be very beneficial to us and you. I guess one of the other benefits of being a sheet product, it's consistent. [Shane Clarke] And it comes out of, again, we had the ability to look at a lot of different manufacturers. The one we've got here have really good consistency with their machines, that kind of thing. You're getting a solid 300 micron with some of the other cheaper brands you see on the market can have a bit of inconsistency, so variations in thickness. I guess also the puncture resistance, UV stability for 30 days, consistent thickness are all advantageous to a DPM. And then for our installers, there's a couple of key requirements where it goes, obviously. Limitations of membrane. But what we do need to reiterate, and I suppose everyone watching this will probably know. [Rod Southwood] I hope so. [Shane Clarke] A DPM is a damp proof membrane. This isn't a system using hydrostatic pressure. That's where you'd revert back to a waterproofing membrane or a WPM if you like. It's basically a slab on grade type material, which we see maybe there's a little bit of excavation into a back of a hill where we can incorporate other membranes, which we'll get to. And I suppose to a point is this isn't replacing any of our current systems. [Callum McDougall] No. This is an addition. [Shane Clarke] In addition to the systems. Another use for it, like you said, Rod, under the footings. You quite often see these on slab on grade where it'll be DPM under slab and they bring it into the footing and then the wall membrane's applied, which is a waterproof membrane and the DPM is taped to that membrane. And for a building where you've got on piles above the ground, you can use it in your crawl space. And as you've touched on a slip layer, additional slip layer in our covered membranes and things like that. Which, like I said, we specify a lot with our systems. Advantageous in that point of view. We're happy with the 300 micron for that as well. A little bit more robust. Especially for what we do outside of tanking with the DPM. Peace of mind. One system, one supplier. And I suppose, look, I've even brought a small sample along. And look, it's not the sexiest stuff to show. It's just black. But what we have done is we've got a Nuralite branded tape as well. PVC tape. Right. Your standard application, 150 mil minimum laps, end and sides and then a Nuralite branded tape. You can imagine on a huge area on slab, get this taped off. It's representing your company and ours. That was the DPM. That was the first product of the three. The second one we're going to talk about today is called TREMproof 560A. I've no idea what the numbers mean, but Callum's going to tell us all about the product. [Callum McDougall] The new TREMproof 560A, look, everyone's got a 1.5 mil peeling stick. You guys watching, guys and girls watching, have all used a Nuralite 1.5 peeling stick before. It's back to what you're saying before with the acquisition has opened up our access to all of our global manufacturing partners. We could go out to the market, to the globe and find, you know, a really good solution for us now branded in our own stuff. The 560A, as you can see on the screen, is just a 1.5 mil peeling stick. It's got a high SPS content. Really good stickiness, really good flexibility, and can be used in those colder temperatures within limitations. [Shane Clarke] Some we've seen, like you would have seen on site, Rob, some of them are less sticky than others. And some are too sticky. Depending on the quality of manufacturing and the ingredients, some self-adhesive membranes can have a lack of stick and fall off the wall easily. Or the opposite. I mean, hey, look, site conditions do dictate some of that with temperature, but at the end of the day, the materials, quality of manufacture, certainly, and this one is nice and sticky. I've had a bit of a play around with it, and it's a nice membrane. And again, being direct to manufacture, we're going to be really economical in the market too. [Rod Southwood] It's not going through multiple sets of hands in it. Less middlemen, isn't it? [Shane Clarke] Less margin tacked on. I suppose to carry on with the next one is it is a positive side or post-applied membrane. As you would, you put your primer on. We have a range of primers which Rob knows off the top of his head. [Rod Southwood] We do have some good primers. We have a solvent-based primer, which is quick dry. We have a water-based primer, and we also have access to a spray primer, which is in a gas bottle scenario with a gun, very similar to the TPO adhesives that we sell. We have three options there. They'd be quick to install. Quick, fast, very sticky, nice primer. Termination with the rest of the stuff we've talked about. As with the DPM, we've ensured that all of our systems feed into each other and are compatible with each other. Different details with different connections, that kind of thing. But that should all be done by ourselves and the architect before it even gets to site, so you know exactly what you're doing. The game is going to touch on the installation requirements, which I'm sure you're familiar with, but you can never say it enough. I think the first rule is always know where your primer line is. [Rod Southwood] The builder told me that block, but it's actually the one below. It's hard to clean off. Oh, well. [Shane Clarke] It does provide an interesting architectural aesthetic. It goes well with acrylic paint. Like every system, we don't want to sit here and say it's the best thing in the world. It can be used anywhere. Everything has its limitations, doesn't it? So things like, as everyone knows that's watching, we need it dry. We need it clean. It needs to be smooth. Flush pointed block work is necessary. Still get called out to jobs today that were done by different people at the industry and the blocks aren't flush. [Rod Southwood] And there's water migration through the line of the block down to your weakest point, which is your wall meets floor, cold join, and you've got problems. [Shane Clarke] They've got to be flush. And storage is pretty important. I mean, anyone that's used a roll membrane before and has left it lying on its side for too long. One, I mean, your water tightness integrity is not in jeopardy, but it's a lot harder to install. And obviously we want it, you want it warm too. You don't want to pull up to a cold site in winter with cold block or cold concrete with a roll that's been left outside. Nothing's stuck. It's just going to be a nightmare. You do want to store it cool, but before you use it, you want it warm. I guess so. It says store call, which is fine because you obviously don't want to leave it out in the sun, but the day you're going to use it, then by all means, have it warmed up because you're going to get far better adhesion. It's going to be more pliable, easier to install. We have seen rolls that are sort of left outside on site for weeks on end out in the sun on their side. And you'll find that as the adhesive's pressure sensitive, you actually won't get the release liner off. [Rod Southwood] We won't get the release and then just the unrolling. You also find they go flat, don't you? And then when you're rolling it, it's like dung, dung, dung, dung, dung. [Shane Clarke] Square membrane. And you're trying to get those depressions out, never seems to pan out. Just makes it a lot, a lot harder to install. Being SPS modified, that's great. Soft, sticky, and stretchy. But of course there's the other side of that coin. The UV resistance isn't as high as some others, right? Got to protect it from the sun until we're ready to use it. We touched briefly on the different types of primers. Just want to go on over, just quickly touch on those again. We've got different types for different applications. We have the quick dry solvent primer, Nuraflux QD. Great primer. Probably one of my favourites. It was one of my favourites until the recent one came out that's now in a gas bottle formulation that you can spray. [Rod Southwood] That's fantastic. It's an adhesive hand primer. It's an adhesive primer. [Shane Clarke] It's controllable. It's not dripping all over the ground. Your rollers, you know, losing out primer. It's nice and then we have the water-based primer number 10, which is still a very good primer. And what I like about number 10 is it reactivates under heat. You can pre-prime with number 10 and when you come back, it reactivates. It's got a different feel all together, but obviously three primers for three scenarios. I guess from an architectural perspective, when you put into the specification, the spec will just call up a number of primers and that'll give the applicator, the options on site. They might need to get an area done quickly in a hurry. They'll use a spray primer or it might be in a hole. They don't really want to use solvent. That's where the water-based becomes handy for health and safety. It's one of those things, if you're ever in doubt, ring one of us. And we want to limit the UV exposure. We do want to limit the UV exposure and it's as it's much like the DPM 30 days. I suppose the tag there too is if you're on a site and that happens before there's a delay, it's not going to be covered. Simply put some drainage board or board over top and that's protecting it from the UV while the builders catch up. This is a big question we get. Read the code. I guess at the end of the day, concrete curing times, like our data stipulates 28 days as your minimum cure for concrete. And that's simply to get your moisture to 5%. RH 75. But it also locks up free line, which attacks different types of membranes. [Rod Southwood] There's also that as well in there and it's also about NPA. You're also aiming for a 20 NPA substrate. [Shane Clarke] I mean, we get this question a lot too. Do we have a membrane for green concrete? That my friend, we do, but you're going to have to log into part three. We've touched on the DPM and we've touched on the 560A self-adhesive. And then to bring us home, we've got the TREMproof FBM plus. What does the FBM stand for? [Callum McDougall] A fully bonded membrane chain. [Shane Clarke] You can probably tell in this photo that it's pre-applied. Pretty important logo at the top there. [Callum McDougall] This is a fully brands appraised system and this comes in line, this is brands appraised with the 560A pedal and stick that we saw before. This essentially creates one system. The TREMproof FBM, now a lot of our applicators, if they've used their old HDPE systems, very similar. Again, just coming from our manufacturer now. We're putting it in the market, similar jobs, but a bit of price point and a high-quality membrane. Again, just that advantage being direct to manufacturer. [Shane Clarke] When this product was first rolled out back when Rod was, didn't have his grey hair, there was a patent on the adhesive technology. [Callum McDougall] Now that expired. That technology is now available to all manufacturers. We're able to get our hands on top of it. [Shane Clarke] Brief description of what it is. It's a 1.4 millimeter thick, pre-applied to under slab, particularly good in blind side tank and that kind of thing. It's an HDPE membrane. You touched on before that the bonus is super high tech laps. There's no additional lap tapes or adhesives needed. It's, peel off the backing, and incredible adhesive technology and then an overlap tape, which we'll touch on shortly, I suppose. I think one of the other things I like about this particular version of the product, it's actually got a release film on it. It protects that adhesive face before the concrete and it's got that plastic sheet on it. [Callum McDougall] It keeps it clean. [Shane Clarke] Peel off just before steel. So as Callum said, it's used on blind side complex concrete. The FBM membrane is compatible with our other membrane types, including the 560A and the 560A with the FBM as for your deep basements and your risk areas and hydrostatic pressure. [Rod Southwood] Hydrostatic to a certain degree as well, right? [Shane Clarke] This product is hydrostatic to 70 metres ahead. So here we have a pile head detail. Right. You can see our FBM butts into that pile. We then have a Demonic 100 sealant fillet installed. Post that, we put on our Nuralite BG polyurethane coating, which is a one part brushable coating. You have to mix two piles. Not mixing two piles, take off the lid, use what you need, put your lid back on. This can go over the freshly installed filleted Demonic 100. Then you wait 24 hours for the next coat. And it's a two coat system of the PU. That's also finished off with the TREMproof water stop, which is a hydrophilic water stop. As you'll see here. This is just one version of our pile cap detail. There's multiple options out there for, depending on your type of installation, your type of pile and things like that. The amount of hydrostatic pressure, just that level of security we need. We can develop different, different ways to do it. And also sometimes the piles are flush with the site concrete. You won't have a step. [Rod Southwood] Sometimes engineers want full bond at that point. You're bringing this back a bit further. There's a few options for pilings. [Shane Clarke] What does the BG stand for? [Callum McDougall] Below grade polyurethane. [Shane Clarke] Below grade. Pretty simple, isn't it? Easy to remember. The key point of this slide here is just to basically illustrate that it's a complete system. We've talked about three products. We can't bring everything into the studio and talk about all the key accessories that go with it, just trust us when we say that, it does come with all the accessories, which complete the whole brand's appraisal system. So again, just some limitations and applications around the FPM. Like most membranes and when you're dealing with self-adhesive or peel and stick, it comes down to the ambient temperature. If you're on a cold concrete slab, your membrane's cold, your atmosphere's cold, it's just going to delay your, your adhesive, within your laps, creating a bit more work and a bit more rolling. Keep it above five degrees. Temperature's a key consideration. Not just during installation, but even like 24 hours afterwards, what we want to make sure that those adhesive laps have had enough time for the initial grab. Bear in mind that this building is going to get buried for the next hundred years. We've only got one chance to get it right below ground. You want to make sure your surface you're applying to a nice and clean and tidy. It's pretty, pretty standard stuff, you can see some amazing YouTube videos on the stuff where they, where they put these laps to the test. I mean, that's not real life. We don't want that happening in real life, but if you do want it, YouTube, FPM plus, and check out some of the cool videos of them highlighting that. And we do have check sheets for everybody. You do know that what we wanted in the substrate before laying the membrane, you know, smooth, no sharp objects, things like that. It's the other key point we want to highlight around the adhesives and tapes is their pressure activated, right? [Callum McDougall] Correct. You need a roller. You're going to roll them together with force. [Shane Clarke] Get a nice pressure seal. And that's, we're just talking lap rollers here. Like any membranes, you don't want to be doing it in the rain or snow. For a multitude of reasons, mainly because it's wet. You might see a YouTube video with them doing it underwater, but I think that's more just telling you how good the adhesive is. [Rod Southwood] We don't suggest it's in your case. No. It's because you can, doesn't mean you should. [Shane Clarke] There you go. This is my favourite slide cause it's the last one. But we've talked about the three products we've talked about the DPC, the 560A self-adhesive and then the pre-applied FBM and all those products and accessories come together and create the tanking system, right? This slide here basically depicts the whole system. This is giving you a nice look of the whole system, isn't it? Substrate membrane protection slash drainage, closing flashing, which is going to protect your insulation there as well as prevent grits and other things getting down behind it with a sealant on top. That's a half wine glass on top there. We have a range of sealants for those as well. And I suppose when you look at something like this too, it's, it's good to know that now we've got such a wide range of tanking systems. You look at, there could be three different systems in there that will create three different products, sorry, product lines that we'd create one system with. It's not one, one size fits all. I quite often see DPM under slab that then is taped to a FBM membrane that will then transfer under the footing. And then that will then transfer to the 560A self-adhesive on the wall. You can have all three of these options in one build. [Callum McDougall] In one build. [Shane Clarke] And having all of our documents and all of our tapes and method statements, it's fantastic in that sense. It just gives you that design flexibility depending on what's happening on the day. Project budgets too. Every project's different. Every site's different. We have the ability now to adapt and work with designers and homeowners to, to put the right option forward. Very unlike me, but I did tell a lie. This is the last slide. The previous one was obviously the second to last slide. What we're showing here is I guess the flexibility you've got. And with our closure flashings, we offer three different types. We have one for the membrane with a newer drain drainage board, which will close the and yet again, sealant on top. We also have one, if you're using the 80 mil XPS combi drainage slash insulation material on the membrane. And then if you want the bee's knees, well, you've got the membrane and the combi and the newer drain. We have flashings to cover all of those scenarios. Lots of design flexibility there. We've said that it's going to protect structures with hydrostatic pressure down to an incredibly low depth. I mean, how does it do that? That's part of the fully bonded membrane and the name Shane. [Callum McDougall] What this does is it's an adhesive technology that connects to the concrete once it's poured. The membrane itself becomes part of the structure. It's nothing to do with the site slab or the compacted hard fill. And what this does is mitigates any lateral water migration. If there was to be a piercing within that membrane. [Shane Clarke] And also I guess if there's subsidence underneath or something. [Callum McDougall] That's right. If you have liquefaction, if you have subsidence of any sort, the advantage of a fully bonded membrane is that it stays adhered to the host slab. [Shane Clarke] And I've been to some sites where the banks have fallen away and I've looked up and you can stand in as the membrane is adhered to this slab. So it's there on the slab. It's not going to fall away. I'm based in Christchurch and to us, that's a big deal. You need a fully bonded membrane to your structure because of that subsidence or liquefaction. It doesn't then affect water integrity of the building. All right, folks. Well, thanks for tuning in to what's new part two. We touched on the DPM, 300 micron thick membrane. For damp proofing, we touched on the 560A, the self adhesive membrane. We then touched on the HDPE pre-applied membrane and how they all go together as a system. And obviously being direct to manufacturing now under our new owners at Tremco, we're going to be a lot more competitive in the market. Therefore, you know, as a Nuralite applicator, you'll be a lot more competitive in the market. We can all pass that on. Remember there's a survey in the link below. Feel free to jump in and chuck your answers in there to go in the draw to a $100 fuel voucher. Grand prize if you do all three of a thousand. Congratulations again to National Waterproofing who won last webinars prize. Well done. [Rod Southwood] Congrats. [Shane Clarke] And we'll see you early in new year for what's new part three. Ka kite anō.

FAQs

What is the Nuralite DPM, and what is its primary purpose?
The Nuralite DPM is a 300-micron damp proof membrane designed primarily for underslab applications. It provides protection against moisture ingress and can also be used under footings, in crawl spaces and as a slip layer in various Nuralite systems. It offers consistent thickness, good puncture resistance and 30-day UV stability.
What are the key features of TREMproof 560A?
TREMproof 560A is a 1.5mm self-adhesive, peel-and-stick waterproofing membrane. It features high SBS content, excellent adhesion and flexibility, and can be applied in cooler temperatures within specified limitations. It is compatible with other Nuralite systems and can be installed using a choice of three primers: solvent-based, water-based or spray-applied.
What are the key installation requirements for TREMproof 560A?
The substrate must be clean, dry, smooth and flush-pointed where applied to blockwork. The membrane should be stored cool but warmed before installation to improve adhesion and flexibility. UV exposure should be minimised, and the membrane must be protected if installation is delayed. Concrete should generally have a minimum 28-day cure before application.
What is TREMproof FBM Plus, and where is it commonly used?
TREMproof FBM Plus is a 1.4mm HDPE fully bonded, pre-applied waterproofing membrane. It is particularly suited to underslab applications, blindside tanking and deep basement construction. Its adhesive technology bonds directly to poured concrete, helping prevent lateral water migration if the membrane is damaged. It is designed to withstand hydrostatic pressure up to 70 metres of water head.
What is the advantage of having the DPM, TREMproof 560A and TREMproof FBM Plus available as one integrated system?
Having all three products available through Nuralite provides a complete waterproofing and damp proofing solution from one supplier. The products are designed to connect and work together, providing compatible detailing, accessories, tapes and method statements. This gives designers and applicators greater flexibility to select the right system for different site conditions, project requirements and budgets.
bottom of page